Single Shaft Double Shafts Waste Plastic Metal Wood Shredder Crusher for Lumps Bottles Pipes Recycling High Output Low Noise Grinder PP Boards
After Service
Send your inquiryDESCRIPTION
Basic Info
Model NO. | acm |
Computerized | Computerized |
Certification | CE, ISO9001:2008 |
Motor | Siemens Beide |
Blade Material | SKD-11 |
Warrenty Time | 13 Monthes |
Application | All Plastics |
Inverter | ABB |
Transport Package | Strench Film and Wood Pallet |
Specification | ACM-C-500 |
Trademark | ACM |
Origin | China |
HS Code | 8477800000 |
Production Capacity | 200 Sets |
Product Description
After Service
Technical documentation |
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English. |
Arrangements for inspection, installation and testing of the equipment |
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory. c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer. |
Quantity and quality guarantee |
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. c. Long-term service:Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance. |
Related Products
-
Best Price Waste Air Conditioner AC Radiator Separator Aluminium Copper Radiator Scrap Recycle Machine
-
Popular Benfu Copper Coil Wire Pulling Machine Motor Stator Wrecker Waste Motor Stator Disassembly Machine Used for Metal Recycling Factory
-
Exporters Small Recycling Single Shaft Thick-Wall Resin Crusher with Belt Conveyor
-
High Capacity Double Shaft Commercial Industrial Automotive Bicycle Car Truck Mechanical Used Rubber Tyre Tire Waste Recycling Plastic Shredder Crusher Machine